The team at General Excavation lead a project that widened Route 277 (Fairfax Pike) to provide additional traffic capacity, just east of the Interstate 81 northbound ramps at exit 307 to Double Church Road (Route 641). Fairfax Pike was be widened to four lanes with a median from east of the I-81 northbound ramps to east of Double Church Road where Fairfax Pike transitions to two lanes at the project. Portions of the Fairfax Pike median were raised and other portions of the median were striped to provide turn lanes as well.

Comments are closed.